Instructions

Check out our guides below to successfully and efficiently install our products. 

Casework & Tops Maintenance Guide

7 Flex Installation Instructions

Bolt Together Table Installation Instructions

OPS Cabinet Installation Instructions

Island Shelving System Installation Instructions

Phenolic Resin Countertop Installation Instructions

Proteus Table Installation Instructions

Reagent Shelving Installation Instructions

Table Set Installation Instructions

Upright Installation Instructions

Wall Cabinet Blocking Detail Instructions

Wall Upright Assembly Instructions

SPECIAL NOTE:

For epoxy resin countertops that are 1″ thick, we do not recommend unsupported spans longer that 36” or unsupported over hangs longer than 6”.

3rd Party Instructions

OPS Fume Hood Installation Instructions

OPS Fume Hood Sash Stop Instructions

OPS Metal Laboratory Casework Instructions

Labconco Ceiling Enclosure

Hit Enter to search or ESC to close